Our Model >  Progress >   Up | Q1 2004 | Q2 2004 | Q3 2004 | Q4 2004
Progress during 1st Quarter 2004

Progress picked up in January and the photos show this. Chris and Paul forged ahead with the switches on the front of the layout and they are now all in place (although not wired or motored) and working!  Even Steve has had a go at laying switches in the fiddle yard to provide new storage sidings - he has also finished most of the work on the third building.

This is what it looks like:

jan04-1.jpg (33730 bytes)    jan04-2.jpg (43689 bytes)    jan04-4.jpg (41622 bytes) 
Before we focus on the switches, here are the three buildings so far completed, Chris and Paul showing that laying switches is a very serious job, and three old HO hands assessing progress!

jan04-5.jpg (46792 bytes)   jan04-6.jpg (45791 bytes)   jan04-7.jpg (43227 bytes)
Shouldn't something go here?     What about this?                            Yes - it fits!
 
jan04-10.jpg (45833 bytes)    jan04-11.jpg (49315 bytes)    jan04-12.jpg (46907 bytes)
The completed switches as laid in Jnuary by Paul (left), Steve (some only - centre) and Chris (right).

Progress also continued well in February and March. Chris put finishing touches to the turnouts and trackwork on the front of the layout and Paul removed, wired and replaced two baseboards as he starts the laborious task of wiring the layout.   Although we will use DCC eventually, he is wiring for standard operation at the start with four blocks.  Chris has also built and placed a model weighscale (see photo #707). 

The wiring (I didn't get the exciting photos of Paul actually doing it) is, as usual, quite inspiring! :
feb04-2.jpg (9721 bytes)  feb04-3.jpg (13001 bytes)  mar04_2.jpg (18237 bytes)

Chris starting on the finishing touches at the baseboard joints, and an open view of the layout without the backboard - removed so that baseboards can be taken out and wired:
feb04-5.jpg (18239 bytes)  feb04-6.jpg (23387 bytes)  feb04-4.jpg (20714 bytes)

The (non-functioning) weighscale built by Chris (see photo #707)and a caboose under construction by Steve:
feb04-7.jpg (23738 bytes)   feb04-8.jpg (30761 bytes)  
mar04_3.jpg (23178 bytes)


Send emailto Steve (details on contact us page) with questions or comments about this web site.