Home
CNJ
CNJ Books
Steam... [3 photo tables]
Diesels... [table/paint sch.]
CNJ Links
CNJ Models in HO
Steam Models Table
Steam Model Photos...
Diesel Models Table
Diesel Model Photos...
Loco. Kitbashes
Mauch Chunk
Buildings...  [plans]
Railroad...
Photos...
Plans & Maps
Books & Links
Our Model
Progress...
Projects...
Track Plan
Articles
The Modellers...
Site Map
Thanks
New on the site
Contact Us
 

Our Model >  Progress >    Up | Jan. 2003 | Feb. 2003 | Mar. 2003 | Apr. 2003 | June 2003 | Q3 2003 | Q4 2003
Progress by end June 2003

Here's the progress in May and June together, as May was rather slow.

may-jun1.jpg (39543 bytes)  may-jun3.jpg (37654 bytes)          may-jun2.jpg (38552 bytes)  may-jun4.jpg (37250 bytes)
Paul carried on cutting holes for switch motors and wiring the switches in the storage yard, and has now completed it.

may-jun5.jpg (31155 bytes)  may-jun6.jpg (25896 bytes)  may-jun7.jpg (26743 bytes) 
Steve carried on laying sidewalk and Ian carved a tunnel mouth, required to get the track off the LH end.

may-jun8.jpg (41000 bytes)  may-jun9.jpg (29175 bytes)  


may-jun10.jpg (39285 bytes)  may-jun11.jpg (37664 bytes)  may-jun12.jpg (30093 bytes)
Chris and Steve cut away some of the riverside wall as in the prototype and Chris planned out the bridge and built the buttresses.  Chris (with Paul's help) spent most of May and June building lighting gantries for the club layouts.

may-jun13.jpg (27762 bytes)  may-jun14.jpg (26002 bytes)  may-jun15.jpg (22972 bytes)
Steve has been building the first store on Susquehanna St. from plasticard on a perspex frame. This will be the subject of a separate article shortly (it looks better in the pictures than in real life!).


Send emailto Steve (details on contact us page) with questions or comments about this web site.
Last modified:  August, 2008